− | #Check 1 or more | + | #Check 1 or more days.<br> |
− | #Enter the number of days per | + | #Enter the number of days per week in the 'Days p/w' field.<br> |
− | #If the | + | #If the 'Number of days' equals the number of entered days the Webber shall book all the days. |
− | #:In the figure the Webber shall | + | #:In the figure the Webber shall schedule the booking on Thursday and Friday. |
<p></p> | <p></p> | ||
− | + | [[Bestand:100enWebPlanboardBookDateAndTime8.png|550px|none]] | |
− | + | ||
− | + | ||
− | [[Bestand:100enWebPlanboardBookDateAndTime8.png| | + | |
<p></p> | <p></p> | ||
Versie van 11 mei 2023 om 17:29
Day and time selection
The Periode frame (see figure below) contains fields for you to enter and afterwards view information about dates and times.
You can enter when a booking takes place and see this information after the booking has been scheduled.
You can determine the date ín 3 calendars: via 'Specific date', via 'Standard weeks' and via 'Working weeks.
Tip: You can always switch between the 'Standard weeks' and 'Working weeks'.
- If only 1 day is selected then you can also switch to and from 'Standard date'.
Date selection
The option 'Specific date' is the standard selection. Use this option to enter single date.
- Click the date button on the right. A calendar appears.
- Click the left arrow above to select a preceeding month.
- Click the right arrow above to select a succeeding month.
- Click a year below to select it.
- Click a day in the middle to select it.
In the figure the selected date is 12 May 2013.
Tip: You can also type a date directly in the date field. You must use the correct notation such as shown in the figure above: '12/05/2023' (dd/mm/yyyy).
Time selection
The option 'Standard hours' is the standard selection.
- Enter the begin time.
- Type the time in the 'From' field.
- Enter the end time.
- Type the time in the 'Until' field.
For example: from 10:00 to 12:00.
Standard duration of a booking
The system administrator may configure a standard booking duration.
When you open a new booking form in the timetable then the end time will get set automatically.
In the figure you selected a new booking to start at 12:00 and since the duration is 120 minutes the end time is automatically set to 14:00.
If you have administrator authorisation then you can find an explanation for this setting in Booking form settings .
Standard week selection
Booking with several weeks
You choose the Standard weeks calendar when you need to schedule a series booking that takes place on several days and weeks.
- Select Calender.
- Enter the year.
- Click the menu icon on the left side of the Year field to select the year.
You can also type the year directly in the Year field using the notation: '2023' for example.
- Enter the weeks.
- Click the menu icon on the left side of Weeks to get a list of selectable weeks.
- You see the calender weeks of the year you entered with their begin and end dates.
- Check the box of a week to add it to the field.
You can also add several weeks.- Click the cross on the bottom right to close the window.
- Click the menu icon on the left side of Weeks to get a list of selectable weeks.
- Enter the number of weeks.
- If the number of weeks equals the number of entered weeks then the WebberAlgemene benaming voor WebPlanboard of WebView. shall book all selected weeks.
In the figure the selected weeks are 19 and 20 and 'Number of weeks' is 2.
Booking with a choice from several weeks
You can let the WebPlanner search for suitable weeks.
- Enter the possible weeks in which the booking series may occur.
- Enter the number of weeks the booking series occurs in.
- If the 'Number of weeks' field is less than the number of entered weeks it means that you let the WebPlanner choose in which weeks to plan the booking.
In the figure the WebberAlgemene benaming voor WebPlanboard of WebView. may choose 2 weeks from the calendar weeks 21, 22 and 23.
Booking with several days
- Check 1 or more days.
- Enter the number of days per week in the 'Days p/w' field.
- If the 'Number of days' equals the number of entered days the WebberAlgemene benaming voor WebPlanboard of WebView. shall book all the days.
- In the figure the WebberAlgemene benaming voor WebPlanboard of WebView. shall schedule the booking on Thursday and Friday.
Booking with choice from several days
You can let the WebberAlgemene benaming voor WebPlanboard of WebView. choose the most suitable days.
- Check the possible days.
- Enter the number of days per week in the 'Days per week'field .
- If you enter less days in 'Days per week aangeeft than in 'Days' then you enable the WebberAlgemene benaming voor WebPlanboard of WebView. to choose the most suitable days for the activities.
In the figure the WebberAlgemene benaming voor WebPlanboard of WebView. 2 may choose 2 days out of Monday, Tuesday and Wednesday.
Tip: Enter your preferred days first.In the example above Monday and Tuesday get preference above Wednesday.
Warning: If the option 'Days per week' isn't visible (since the field is configurabel) then the WebberAlgemene benaming voor WebPlanboard of WebView. books all the days you entered.
This applies to normal and non-available booking types.
Working week selection
The option 'Work weeks' when the WebberAlgemene benaming voor WebPlanboard of WebView. is configured with 'Work' dates: Work year, Period and Work week.
A work year can begin and end on a different date than the begin and end of the calendar year.
A work year contains 1 or more periods and a period contains 1 or more work weeks.
For example: work year of the WebberAlgemene benaming voor WebPlanboard of WebView. used for this documentation is divided into 4 periods: spring, summer, autumn and winter.
Book several working weeks
- Enter the work year.
- Enter the periode, 3 for example (spring).
- <p>
- Enter the work weeks.
- Click the icon to get a list of the work weeks.
- Once you have select a week ik gets added to the Weeks field.
- Click the X at the top right to close this window.
- It is first necessary to enter the year and the period and then the weeks.
- Click the icon to get a list of the work weeks.
- Enter in the number of weeks in the 'Number of weeks' field.
- If the number of weeks equals the number of selected weeks the WebberAlgemene benaming voor WebPlanboard of WebView. shall book all the weeks.
- In de figure the work weeks 5 (the week of 22-10-2018) and 6 (the week of 29-10-2018) of period 3 (autumn) are selected.
Book with a choice from several working weeks
- Enter the work weeks.
- Click the icon to get a list of the work weeks of the period.
- Once you have selected a week it gets added to the 'Weeks' field.
- Click the icon to get a list of the work weeks of the period.
- Enter the number of weeks in 'Number of weeks' field.
- If you enter less weeks in 'Number of weeks' than in weeks in the 'Weeks' field the WebberAlgemene benaming voor WebPlanboard of WebView. may choose the most suitable weeks for the bookings.
- In the figure the WebberAlgemene benaming voor WebPlanboard of WebView. may choose 2 weeks from the work weeks 5, 6 en 7.
Tip: Enter your preferred weeks first.
In the example above the weeks 5 and 6 get preference above week 7.
Working times
The option 'Work time' is applicable if the WebberAlgemene benaming voor WebPlanboard of WebView. is configured with work hours.
For example: a booking in work times, from: work hour number 1 work hour with a duration of 1 work hour is equivalent to the clock times, from : 09:00 til: 10:45.
- Enter the desired begin work hour in the from field.
- Enter the number of work hours of the booking in the Duration field.
The booking in the figure below begins in clock time at 09:00 and ends at 12:30.
In work time it begins at work hour 1 met with a duration of 2 work hours (09:00-10:45 and 10:45-12:30).
It is also possible to view the booking times in work hours.
In the figure below the clock times from: 09:00 til 12:30 is displayed in a duration of 2 hours (both work hours 1 and 2 have a duration of 105 minutes).
It is also possible to view the duration in minutes.
In the figure below you see the clock times from: 09:00 til 12:30 displayed with a duration of 210 minutes (both work hours 1 and 2 have a duration of 105 minutes).
Tip:
- It is not always possible to convert clock times to work times with a duration in hours.
- This is because in the work time framework a booking must always fit into exact work hour durations.
- It is however possible to convert all clock times to work times with a duration in minutes.
Tip:
- It is possible to begin a booking not exactly at the mogelijk om de start van een boekingEen roostering van een of meer middelen op een of meerdere tijdstippen. niet precies op het beginuur te laten starten.
- Hiervoor kunt u het veld Offset gebruiken om het aantal minuten in te voeren.
In de figuur hieronder ziet u een boekingEen roostering van een of meer middelen op een of meerdere tijdstippen. in kloktijden van 09:15 t/m 10:15 en in werktijden als: Vanaf: 1, Duur: 90 en Offset 15 weergegeven.
Tip:
- It is also possible to enter several begin hours.
The WebberAlgemene benaming voor WebPlanboard of WebView. can then choose which begin hour is the most suitable.
It shall choose conflictEen probleem in het rooster dat opgelost moet worden. Voorbeeld: een medewerker die op hetzelfde moment in twee verschillende ruimten moet zijn. free begin hour.
In the figure below the hours 1 and 2 are the begin hours.
- It is not possible to enter several begin hours when using clock times.
Preceding and succeeding pause
When you enter a pre or post pause the WebberAlgemene benaming voor WebPlanboard of WebView. will produce a conflictEen probleem in het rooster dat opgelost moet worden. Voorbeeld: een medewerker die op hetzelfde moment in twee verschillende ruimten moet zijn. if any other booking overlaps these times.
You can choose to only have a pre or post pause or both.
- In the From and Til field enter the actual time the booking takes place.
- Check 'Pre Pause'.
- Enter the pre pause duration in minutes.
- Enter the post pause duration in minutes in the 'Post Pause' field.
- The WebberAlgemene benaming voor WebPlanboard of WebView. shall try to ensure that the booking including its pre and pause times is conflictEen probleem in het rooster dat opgelost moet worden. Voorbeeld: een medewerker die op hetzelfde moment in twee verschillende ruimten moet zijn. free.
- In the figure the actual booking is from 14:45 til 16:45 but the WebberAlgemene benaming voor WebPlanboard of WebView. tries to ensure that the booking is conflictEen probleem in het rooster dat opgelost moet worden. Voorbeeld: een medewerker die op hetzelfde moment in twee verschillende ruimten moet zijn. free from 14:15 til 17:00.
Tip: In the Calender timetable you can make a pause visible is desired.
In the figure you see that on Tuesday 2 oktober 'Visit' has a pre and post pause.
Warning: The user group configuration setting determines whether the pause is visible. So it is possible for example to show pauses in timetables of the planners group but not in the viewers group.
If you have administrator authorization you can find information about this setting in Timetable settings vinden.
Standard setting of pauses
It is possible to set a standard pause value for both pre and post pauses.
This depends on the Bookings form setting af.
When you open a new booking the pre and post pauses will already be set to the standard values.
The figure shows a new booking. The pre pause is set to 30 minutes and the post pause to 15 minutes.
Tip: This can be useful when the bookings in your timetable occur at regular times.
Date and time shifting
You can shift a booking in weeks, days and times.
When you enter a shift the WebPlanner calculates the new date and times of the modified booking.
- Use a positive number to shift forward in time.
- Use a negative number to shift backward in time.
Warning: After submitting the booking the WebPlanner calculated the shift in the standard weeks, days or begin times.
Year shifting
Enter the number of years to shift in the Year shift field.
In the example you want to shift the not yet scheduled booking on Friday 12 januari 2018 1 year forward:
- Check the Year shift box
- Enter 1 in the Year shift field
- Click the Modify buttion for example.
The figure below shows that the booking now occurs on Saturday 12 January 2019.
All work weeks stay the same in the Work weeks frame.
All the calendar weeks stay the same in the Calender weeks frame.
In the case of Date the day and month stay the same.
Tip: 29 february cannot always be shifted and neither can week 53 since both are irregular.
Warning: In the case of a year shift of a booking with several weeks, the same weeks should also be present in the new year.
Period shifting
Enter the number of periods you want to shift the booking in the Period shift.
In the example you want to shift booking in period 1 of work year 17 one period forward.
- Check the Period shift box
- Enter 1 in the Period shuift field
- Click the Modify button
The booking is shifter to work year 17 period 2 and work week 20.
In the Work weeks all the work weeks stay the same.
The Period shift is not applicable in the Calendar weeks.
The Period shift is not applicable in the Date framework.
Tip: You cannot shift a period accross a work year.
Warning: In the case of a period shift of a booking with several weeks, those weeks must also be present in the new period.
Week shifting
Enter the number of in the Week shift field. <p> In the example you want to shift the booking series in the weeks 35, 36 and 37 2 weeks forward:
- Check the Week shift boxde
- Enter 2 in the Week shift field
- Click the Modify button
In the example below the booking series is now in the weeks 37, 38 and 39.
Tip: All the weeks will be shifted in the case of several weeks.
Day shifting
Enter the number of days in the Day shift field. <p> In the example you want shift the series booked in the weeks 37 38 and 39 on Friday back to Thursday:
- Check the Day shift box
- In the Day shift enter the number -1 (implying shift back 1 day)
- Click the Modify button
In the example below the booking series on Fridays in the weeks 37 38 en 39 has now shifted to Thursdays.
Tip: There is no limit to the number of days you can shift, so a booking may also shift to another week.
In the example you want to shift the booking series in weeks 37 38 and 39 on Fridays 3 dags forward:
- Check the Day shift box
- Enter 3 in the Day shift field
- Click the Modify buttion
In the example below the booking series is now in the weeks 38 39 and 40 on Mondays.
Time shifting
In the Time shift field enter the number of minutes.
In the example you want to shift a booking series in the weeks 37 38 en 39 on Friday between 13:00 and 15:00 one and a half hours forward:
- Check the Time shift box
- Enter 90 in the Time shift field
- Click the Modify button
In the example below you see that the booking series in weeks 37 38 en 39 on Friday has shifted to be between 14:30 and 16:30.
Warning: There is a limit to the number of minutes you may shift a booking since the booking must remain within the same day.
Day and time fields read only
The Day and time fields might be read-only for a particular group of users.
This depends on the User group settings.
In the figure you see that the input button on the right-hand side of the Date and time field is missing.
Tip: This can be useful when planners are only supposed to modify other fields of the booking, the rooms for example.
Component of WebPlanboardHet gedeelte van de Webber waarmee men kan plannen.
© 2012-2023 Bitbybit Information Systems All rights reserved. No part of this documentation shall be reproduced, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without written permission from Bitbybit Information Systems. Bitbybit Information Systems, Perspective-DB and IRIS-Planning are registered trademarks of Bitbybit Information Systems.